Varduno Consulting

Plan the equipment systembefore the project starts.

We help general contractors create execution-ready equipment strategies for complex projects—combining hands-on equipment expertise with Varduno’s planning technology.

Determine what is needed, how much, when it should arrive, where it can be shared, and when it should leave—before those decisions become cost, carbon, or schedule risk.

Explore the services

Project-wide equipment strategy

Built from project reality

Geometry & access
Schedule & phases
Workforce & trades
Logistics & delivery
Safety & emissions
Fleet, suppliers & rates
Converted into decisions

The executable plan

What
How many
When
Where
Share
Off-rent

Why we exist

To turn equipment from disconnected rental transactions into a planned, shared, and measurable project resource.

A plan grounded in reality

The right machine depends on the whole project.

A machine is only right if it can safely access the work, support the required productivity, arrive when needed, and leave before it becomes unnecessary cost. That takes more than an equipment list.

Project geometry and physical constraints

Building configuration, excavation scope, floor loading, openings, work zones, access routes, turning space, and ground conditions.

Schedule and sequencing

Phases, milestones, activities, dependencies, overlapping work, and the dates that protect the critical path.

Workforce and trade demand

Subcontractors, crew sizes, shifts, work areas, and the timing of each trade’s equipment demand.

Site logistics

Delivery routes, unloading, storage, charging, refuelling, traffic controls, hoist access, and pickup constraints.

Safety and environmental requirements

Operator requirements, emissions and noise restrictions, exclusion zones, indoor power, and carbon targets.

Supply and commercial data

Owned fleet, supplier catalogues, rate cards, availability, transportation costs, rental periods, and alternatives.

Consulting services

From first demand model to an operating jobsite.

Start with the stage your project needs now. Each service creates practical deliverables that can continue inside Varduno.

01

Project equipment strategy

Translate the schedule, work scope, and site conditions into equipment demand by phase, task, trade, location, and date.

  • Demand curves and peak periods
  • Quantity and timing assumptions
  • Delivery and off-rent windows
02

Shared equipment pool design

Identify where machines can serve multiple trades, zones, and overlapping phases without creating delay or unclear responsibility.

  • Pool composition and capacity
  • Reservation and priority rules
  • Utilization and service measures
03

RFx and supplier strategy

Convert the equipment plan into structured supplier requirements that can be clarified, priced, and compared consistently.

  • RFx package preparation
  • Substitution and compliance review
  • Bid comparison and mobilization
04

Digital workflow and integration

Define how project, workforce, fleet, rental, and commercial information should move through the project’s existing systems.

  • Current-state technology review
  • Integration and data blueprint
  • Lower-friction field workflows
05

Mobilization and project launch

Turn the strategy into an operating model that project teams, trades, and rental partners can use from day one.

  • Roles and responsibilities
  • Delivery and pickup processes
  • Training and supplier onboarding
06

Continuous equipment optimization

Keep the plan aligned as schedules, workforce, availability, and site conditions change throughout delivery.

  • Idle-time and utilization reviews
  • Cost and carbon comparisons
  • Upcoming demand and risk forecasts
How we work

A practical path from project data to field execution.

We do not start with software. We start with how the project will actually be built, then configure the tools around the decisions that matter.

  1. 01

    Understand

    Review the project, constraints, schedule, workforce assumptions, equipment demand, and current systems.

  2. 02

    Model

    Build the demand model and expose peaks, gaps, sharing opportunities, and schedule risks.

  3. 03

    Source

    Prepare structured requirements, evaluate responses, and isolate what still needs supplier confirmation.

  4. 04

    Mobilize

    Establish the equipment pool, workflows, responsibilities, digital tools, and supplier interfaces.

  5. 05

    Optimize

    Monitor utilization, cost, carbon, and changing demand so the plan remains useful throughout the project.

The digital project backbone

Use the right tools without creating another information silo.

Varduno becomes the equipment-planning and coordination layer while the project keeps using the systems that already hold authoritative information.

We assess what should be connected, what can be imported, and what should remain governed in its source system. Connection availability depends on customer and partner access.

Models & physical context

Trimble Connect and BIM/project geometry sources

Project planning

Procore, Primavera P6, Microsoft Project, and schedule files

Workforce

Procore Workforce, workforce plans, subcontractor data, crew loading, and shift plans

Fleet & telemetry

Fleet management systems, owned fleets, Trackunit telematics

Rental & commercial

Rental ERPs, Rental rate cards

Jobsite Equipment Management

Conaxity equipment sharing

Engagement options

Start focused. Scale with the project.

Begin with a defined planning challenge, then continue into sourcing, mobilization, or ongoing optimization when the project needs it.

Plan

Equipment Planning Sprint

A focused preconstruction engagement that creates the initial demand model, identifies major risks, and establishes the equipment strategy.

Best for estimating, procurement preparation, and early mobilization planning.

Launch

Mobilization & Market Engagement

Detailed planning, supplier RFx, shared-pool design, commercial evaluation, digital setup, and operational launch.

Best for complex projects approaching procurement or site mobilization.

Improve

Embedded Equipment Optimization

Ongoing equipment advisory and analysis throughout construction, powered by Varduno and connected project information.

Best where demand changes continuously and active management protects value.

What the project receives

A usable operating plan—not a strategy deck that sits on a shelf.

Deliverables are matched to the engagement and structured so project teams can maintain them as the work changes.

Project equipment strategy
Phase- and task-level equipment plan
Equipment demand forecast
Shared-pool operating model
Supplier RFx package
Bid comparison and compliance scorecard
Delivery and off-rent plan
Cost and carbon scenario analysis
Digital integration blueprint
Governance and responsibility matrix
Mobilization plan
Performance dashboard and review routine
Start with the project reality

Tell us about your project.

Bring us your schedule, model, and equipment challenge. We will identify where equipment demand, logistics, and supplier decisions create unnecessary cost or schedule risk—and build a practical plan to address it.

Consulting enquiry

Start the conversation

Share your challenge when you are ready. The form only opens after you choose to contact us.