Construction equipment planning

Plan every phase.Equip every project.

Varduno turns construction schedules into a clear equipment strategy—so the right machines arrive at the right time, with the right commercial model behind them.

Phase-based planning Rental-ready RFQs Usage & cost control

Equipment plan

North Tower · Phase 04

On plan

Phase demand

Interior fit-out

Sep 14–Oct 30

47 days

Electric scissor lifts12 units
Articulating boom lifts4 units
Telehandlers2 units

18

Peak units

$31k

Forecast

3

Open actions

Procurement

RFQ ready

17 equipment lines validated and ready to issue.

2 date conflicts

Resolve overlapping demand before mobilization.

The problem

Equipment planning is still disconnected from the project plan.

Project teams know what they are building. Rental partners know what machines they can supply. Varduno connects the missing middle: when equipment is needed, how much is required, and how the cost should flow.

01

Equipment demand is planned too late

Needs are buried in schedules, emails, and spreadsheets until the jobsite is already under pressure.

02

Rental decisions lack one source of truth

Teams over-rent to protect the schedule—or under-plan and pay for emergency deliveries and downtime.

03

Ownership and billing get complicated

Shared pools, subcontractor chargebacks, direct billing, and owned assets all require different controls.

One connected workflow

From construction schedule to controlled equipment pool.

A planning layer built for the people who schedule, procure, coordinate, and pay for equipment.

Plan

Build demand around project phases

Translate the schedule into a clear equipment plan by phase, location, trade, and date—before the work starts.

  • Phase-based demand
  • Category-specific requirements
  • Owned vs. rental visibility

Procure

Turn the plan into a rental-ready RFQ

Create a structured request with quantities, specifications, delivery windows, commercial terms, and vendor response fields.

  • Standardized RFQs
  • Comparable vendor responses
  • Fewer missing details

Control

Know who uses what—and who pays

Configure the project’s equipment model and keep usage, responsibility, and costs aligned from mobilization to off-rent.

  • Shared-pool policies
  • Usage attribution
  • Chargeback-ready records
How it works

Make equipment a planned project resource—not a last-minute order.

Varduno gives project teams one repeatable method from early planning through rental procurement and site control.

Sign up and build your first plan
  1. 01

    Map the project

    Set phases, dates, locations, trades, and site conditions.

  2. 02

    Plan the demand

    Define equipment categories, quantities, specifications, and timing.

  3. 03

    Match the supply

    Allocate owned assets, identify rental gaps, and issue a complete RFQ.

  4. 04

    Control the model

    Track the pool, attribute use, and support the correct billing flow.

Built for the commercial reality

One platform. Four ways to manage who pays.

Set the operating model by project, phase, location, or equipment category. Varduno keeps ownership, responsibility, usage, and cost allocation connected.

Daily or usage-based rates
GC markup rules
Owned and rented assets
Responsibility matrix
Model 1

GC-included pool

The GC rents and provides equipment to every trade.

Model 2

GC chargeback pool

The GC pays first, tracks use, and charges the using trade.

Model 3

Vendor direct bill

The rental partner bills each subcontractor from verified usage.

Model 4

Hybrid managed fleet

GC-owned and rented assets operate in one controlled pool.

Built for complex, equipment-intensive projects

Data centres & industrial
Healthcare & institutional
Commercial construction
Warehousing & logistics
Get ahead of the equipment curve

Bring the project plan and equipment plan together.

Create your Varduno account, set up your first project, and start turning project phases into a clear equipment plan.